Building Aluminum Concrete Wall Aluma Panel Form Systems
-
Payment
-
Origin
China Mainland
-
Minimum Order
1
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
Wood formwork system of its low strength, no water, easy to mold rot, re-use rate is low, the need for consumption of timber resources;
Steel formwork system but the weight is too heavy, the construction of mechanical equipment to help, easy to rust, and in the concrete pouring process and easy to glue together, stripping difficult;
Plastic formwork system is poor rigidity, variable type, and high cost.
At present, due to the construction technology of clean concrete and rapid demolition of the construction technology to gradually promote, in order to meet the new construction needs, aluminum alloy formwork system came into being.
Aluminum alloy formwork with light weight, flexible removal, long life, high precision, pouring smooth, low maintenance costs, high construction efficiency, high recovery value, in Europe and the United States has been more use, and China is gradually promoted.
Description of Aluminium System Formwork
The building formwork consists of a panel and a support system, which is a part of the concrete forming; the support system is a structural part of the solid panel and the upper load.
The quality of the formwork is related to the quality of concrete engineering. The key lies in the accurate size, the assembly is firm, the patchwork is tight and the assembly and disassembly is convenient. Should be based on the form of building structure and characteristics of the appropriate form of choice in order to obtain a good technical and economic results.
The traditional wood formwork system, steel formwork system, plastic formwork system has its own advantages and disadvantages:
Advantages of Antai Aluminum Formwork System
1)Reuse time:
Industry standard reuse time up to 300 times for oversea projects
2) Easy to use:
3)Eco-friendly:
4) High quality:
Antai formwork system has accuracy in 99% for horizontal and 100% for vertical structure.
5)Cost saving:
Save much cost than wooden system formwork once turnover 55 times, meanwhile it can reduce labor cost, and cost for transportation of raw materials, material loss, and waste disposal, etc.
What Integrates AL Formwork System
Formwork System | Forms the closed surface of concrete structure, ensure the forming structure while concreting | Wall panel Slab panel Corner panel Wall End Panel |
Supporting System | Supporting the concrete structure,guarantee the slab, beam, cantilever structure steady | Prop Prop Head Beam Rocker Joint Bar |
Accessories System | The connection components, integrate formwork system and support system into a completed formwork system | Bracket Round & Long &Wedge Pin Bracket Bolt & Nut Kicker Bolt, Nut & Washer |
Working Period
1st Day
Lining up structural lines and installation of reinforcing bars
2nd Day
Installation of wall panels
3rd Day
Installation of Slab panels
4th Day
Installation of reinforcing bars on the slab panels before casting the concrete
5th Day
Casting and curing of the concrete
Antai AL Formwork Solution
- Aluminum Alloy Panel 5 Pieces / (Min. Order)
- Easy Installing Aluminum Alloy Formwork 5 Pieces / (Min. Order)
- Falsework And Formwork Factory 1 Pieces / (Min. Order)
- Cam Lock Forming System Cantilever Concrete Pool Deck Coping Building Forms for Concrete Walls 1 Pieces / (Min. Order)
- Aluminium Concrete Formwork System for Commercial Residential Building 1 Pieces / (Min. Order)
- Aluminium Concrete Formwork and Falsework for Beams in Affordable Housing 1 Pieces / (Min. Order)
- Aluminium Concrete structural I-beam Formwork for High Rise Building 1 Pieces / (Min. Order)
- Aluminum form Work Set Concrete Wall Formwork System Designs Forming 1 Pieces / (Min. Order)
- Gang Aluminium Formwork System Alloy Aluminum A6061-T6 6000 Series for Form Work Designs 1 Pieces / (Min. Order)